03 / Pipeline condition assessment
CCTV Pipeline Survey
Make maintenance decisions with a clearer record of the pipe's condition. The survey approach is selected for the pipeline and the inspection objective, with visible findings recorded and organised into agreed imagery and reporting formats for cleaning, rehabilitation planning or before-and-after comparison.

Applications
Investigation of visible defects before maintenance
Condition recording before and after lining or cleaning
Survey planning for property, facility and construction pipelines
Access and image quality depend on diameter, bends, water level, deposits and obstructions. CCTV principally records visible internal conditions; it cannot by itself establish full wall thickness, external voids or pressure capacity. Uninspected sections and observation limitations should be included in the agreed reporting scope.
Delivery approach
Define the survey objective
Confirm the pipe sections, access points, direction and questions to be answered, and agree the intended report format.
Prepare the conditions
Review cleaning, water levels, access and safety requirements before selecting the camera approach and organising the site visit.
Record the pipe condition
Capture accessible sections, locate visible observations and retain supporting imagery, including any limitations encountered.
Organise the findings
Review the records against the agreed classification and reporting requirements, then assemble imagery and follow-up observations.
Planning & records
Records to agree during planning
- Survey report covering the agreed pipe sections
- Photographs and video within the commissioned scope
- Defect records or grading under the specified reporting rules
- Details of uninspected areas and observation limitations
Useful information for an enquiry
- Pipeline location, chamber references and available access points
- Diameter, material, service and available drawings
- The issue under investigation and previous repair history
- Report purpose, format requirements and access windows
The scope, testing methods, record formats and acceptance criteria are agreed against site findings, client or consultant requirements and the contract.
Greenville Gardens drainage rehabilitation
Explore the work scope, site constraints and associated activities in the company project archive.
Read the project record ↗Common questions
Must the pipe always be cleaned before inspection?
The sequence depends on the objective and condition. Deposits or water can obscure the wall, while some investigations need to record an obstruction before it is disturbed. Cleaning and inspection should therefore be coordinated.
Is a CCTV report a certificate that the pipe is safe?
It records observable conditions and limitations within the commissioned scope. Structural, pressure or other suitability decisions may also require design information, testing or further professional assessment.
Related services
Start with the conditions on site.
Share the location, pipe dimensions, operating use and available inspection records to discuss the next step with our engineering team.