07 / Pipeline cleaning
High-pressure Water Jet Cleaning
Select the cleaning approach for the deposits and the condition of the pipeline. Water jet cleaning can prepare a section for inspection, maintenance or rehabilitation, with tools, water supply, waste handling and site constraints considered together. Verification is arranged to suit the commissioned scope.

Applications
Assessment and removal of deposits or blockages
Preparation before CCTV inspection or lining
Maintenance planning for property and facility drainage
The method depends on the material, deterioration, existing lining, deposits and waste-handling conditions. Nozzle choice, flow and pressure must suit the plan; higher pressure is not automatically better. Removing a blockage does not repair cracks, collapse or incorrect connections, and some conditions require another treatment approach.
Delivery approach
Understand the problem
Review the blockage location, maintenance history and available footage to establish the section and the purpose of cleaning.
Select the arrangement
Assess tools, water supply, waste handling and safety interfaces before selecting a method suited to the pipe condition.
Organise controlled cleaning
Clean the specified scope under the agreed plan, with site observations and arrangements for the removed material.
Review and follow up
Verify the result by the agreed method and record unresolved issues or any further inspection and rehabilitation needs.
Planning & records
Records to agree during planning
- Cleaning locations and activities within the commissioned scope
- Cleaning records specified in the project arrangements
- Before-and-after imagery or review information where agreed
- Material-handling and follow-up records required by the work package
Useful information for an enquiry
- Pipe location, use, material and dimensions
- Blockage details, deposits and previous treatment history
- Water supply, waste handling and vehicle access
- Cleaning objective, drawings or existing survey footage
The scope, testing methods, record formats and acceptance criteria are agreed against site findings, client or consultant requirements and the contract.
Shatin to Central Link TBM cleaning
Explore the work scope, site constraints and associated activities in the company project archive.
Read the project record ↗Common questions
Does higher water pressure always give a better result?
No. Flow, nozzle configuration, deposits, material and existing damage all influence method selection. The arrangement must suit the actual pipe and the agreed work plan.
Is a CCTV survey needed after cleaning?
It depends on the objective and the remaining questions. Where wall defects, repair suitability or the cleaning result need to be reviewed, an appropriate survey can be included in the plan.
Related services
Start with the conditions on site.
Share the location, pipe dimensions, operating use and available inspection records to discuss the next step with our engineering team.