Skip to content

07 / Pipeline cleaning

High-pressure Water Jet Cleaning

Select the cleaning approach for the deposits and the condition of the pipeline. Water jet cleaning can prepare a section for inspection, maintenance or rehabilitation, with tools, water supply, waste handling and site constraints considered together. Verification is arranged to suit the commissioned scope.

Illustration of a pipeline cleaning nozzle and high-pressure hose
MULTIPIPE / TECHNICAL SERVICES07 / 07
01 / Project assessment

Applications

Assessment and removal of deposits or blockages

Preparation before CCTV inspection or lining

Maintenance planning for property and facility drainage

Selection considerations

The method depends on the material, deterioration, existing lining, deposits and waste-handling conditions. Nozzle choice, flow and pressure must suit the plan; higher pressure is not automatically better. Removing a blockage does not repair cracks, collapse or incorrect connections, and some conditions require another treatment approach.

02 / From survey to verification

Delivery approach

  1. Understand the problem

    Review the blockage location, maintenance history and available footage to establish the section and the purpose of cleaning.

  2. Select the arrangement

    Assess tools, water supply, waste handling and safety interfaces before selecting a method suited to the pipe condition.

  3. Organise controlled cleaning

    Clean the specified scope under the agreed plan, with site observations and arrangements for the removed material.

  4. Review and follow up

    Verify the result by the agreed method and record unresolved issues or any further inspection and rehabilitation needs.

03 / Project coordination

Planning & records

Records to agree during planning

  • Cleaning locations and activities within the commissioned scope
  • Cleaning records specified in the project arrangements
  • Before-and-after imagery or review information where agreed
  • Material-handling and follow-up records required by the work package

Useful information for an enquiry

  • Pipe location, use, material and dimensions
  • Blockage details, deposits and previous treatment history
  • Water supply, waste handling and vehicle access
  • Cleaning objective, drawings or existing survey footage

The scope, testing methods, record formats and acceptance criteria are agreed against site findings, client or consultant requirements and the contract.

Download the enquiry checklist (.txt)
RELATED PROJECT

Shatin to Central Link TBM cleaning

Explore the work scope, site constraints and associated activities in the company project archive.

Read the project record ↗
04 / Before you begin

Common questions

Does higher water pressure always give a better result?

No. Flow, nozzle configuration, deposits, material and existing damage all influence method selection. The arrangement must suit the actual pipe and the agreed work plan.

Is a CCTV survey needed after cleaning?

It depends on the objective and the remaining questions. Where wall defects, repair suitability or the cleaning result need to be reviewed, an appropriate survey can be included in the plan.

Related services

Technical referencesMultiPipe — Services ↗IBG HydroTech — Pipe Cleaning ↗StoneAge — Pipe Cleaning Tool Selection ↗

Start with the conditions on site.

Share the location, pipe dimensions, operating use and available inspection records to discuss the next step with our engineering team.