05 / Engineering coordination

E&M Coordination and Plumbing Works

Coordinate the interfaces between pipeline works and the site's mechanical and electrical systems. Plumbing, drainage, dismantling and related activities are considered within a defined work package, with scope, connections, shutdowns and handover responsibilities clarified before the works are planned.

Illustration of engineers reviewing plant-room pipework and drawings
MULTIPIPE / TECHNICAL SERVICES05 / 07
01 / Project assessment

Applications

Plumbing and drainage installation interfaces with existing systems

Defined dismantling packages for plant and associated pipework

Shutdown and sequencing coordination around pipeline rehabilitation

Selection considerations

The scope depends on drawings, the existing systems, work interfaces and the personnel required. Coordination does not imply responsibility for all E&M design or every specialist trade. Isolation, testing, sign-off and return-to-service responsibilities must be established in the work plan and contract.

02 / From survey to verification

Delivery approach

  1. Review scope and interfaces

    Review the equipment, drawings and requirements to distinguish each party's work package and the connection points.

  2. Coordinate the sequence

    Agree shutdown windows, isolation and access arrangements, together with the specialist activities that must be coordinated.

  3. Deliver the agreed works

    Organise installation, dismantling or associated activities within the confirmed scope, with changes referred through the agreed approval process.

  4. Inspect and hand over

    Arrange checks, tests and handover to the work-package specification, recording outstanding items and the relevant responsibilities.

03 / Project coordination

Planning & records

Records to agree during planning

  • Scope and interface information confirmed in the contract
  • Work and change records appropriate to the package
  • Inspection or test information agreed in the specification
  • Completion and follow-up lists required for handover

Useful information for an enquiry

  • Latest available drawings and work scope
  • Existing equipment and connection details
  • Shutdown windows, access and site constraints
  • Main-contractor or consultant specifications and handover requirements

The scope, testing methods, record formats and acceptance criteria are agreed against site findings, client or consultant requirements and the contract.

Download the enquiry checklist (.txt)
PROJECT ARCHIVE / 2015

Admiralty Station South Intake Cell

Company project archive: work commenced in early 2015 for Shinryo Technical Services Ltd. at Admiralty SIC, involving mechanical equipment, pipework and ductwork removal, with associated metalwork around existing facilities.

Plant at Admiralty SIC before removal
Before removal: plant and pipework
Area following mechanical equipment removal
Work record: area after equipment removal

Different stages of the same project, photographed from different viewpoints.

View the original company case record ↗
04 / Before you begin

Common questions

Can the works be coordinated with other contractors?

The coordination approach can be discussed against a defined package. Interfaces, sequencing and responsibilities should be agreed by the relevant parties before work starts.

Does the service include all E&M design and sign-off?

That should not be assumed. Design, installation, testing and sign-off scopes, including the necessary qualifications, are confirmed separately for each project and contract.

Related services

Technical referencesMultiPipe — E&M and Other Works ↗

Start with the conditions on site.

Share the location, pipe dimensions, operating use and available inspection records to discuss the next step with our engineering team.