Skip to content

06 / Specialist work planning

Confined Space Work

Work in manholes and other confined spaces starts by assessing whether entry can be avoided. Where entry is necessary, the work must be planned around site-specific risks, appropriately qualified personnel, permits and emergency arrangements, coordinated with the actual inspection, cleaning or maintenance scope.

Illustration of monitoring, ventilation and rescue preparation outside a confined-space entrance
MULTIPIPE / TECHNICAL SERVICES06 / 07
01 / Project assessment

Applications

Maintenance activities associated with manholes and enclosed facilities

Inspection or cleaning work that may require entry

Works requiring coordination with shutdowns, isolation and other trades

Selection considerations

A competent person must assess whether the task involves a confined space or underground pipework and determine the necessary controls. A general safety card, a single gas reading or ventilation alone does not replace the full requirements. Qualifications, permits, monitoring, respiratory protection and rescue arrangements depend on the applicable rules and site plan.

02 / From survey to verification

Delivery approach

  1. Assess the need for entry

    Review the task and space, considering whether remote equipment or another non-entry method could meet the work objective.

  2. Assess and plan

    Have a competent person establish the risks, scope and roles, and coordinate the required controls and emergency arrangements.

  3. Confirm working conditions

    Implement the approved permit, supervision, monitoring and entry-management arrangements before the associated work proceeds.

  4. Close out and record

    Confirm completion and personnel withdrawal through the agreed procedure, then close the permit and organise the required records.

03 / Project coordination

Planning & records

Records to agree during planning

  • Risk-assessment and planning information appropriate to the scope
  • Permit and work records maintained under applicable requirements
  • Monitoring and entry records required by the rules and project arrangements
  • Completion information agreed with the relevant document custodians

Useful information for an enquiry

  • Location, configuration and available access information
  • Task purpose, scope and anticipated equipment
  • Known contents, connected services and isolation conditions
  • Owner or main-contractor site rules and working windows

The scope, testing methods, record formats and acceptance criteria are agreed against site findings, client or consultant requirements and the contract.

Download the enquiry checklist (.txt)
04 / Before you begin

Common questions

Is an assessment unnecessary when equipment is operated outside?

No. The task and location still need assessment. Work near an opening may be affected by hazardous atmospheres or other risks even where a worker does not enter.

Is ventilation and gas testing enough to permit entry?

No. Entry requires the applicable assessment, permit, personnel and other control arrangements. Work involving underground pipework also carries specific additional requirements.

Related services

Technical referencesMultiPipe — Confined Space Work ↗Hong Kong Labour Department — Confined Space Work ↗Labour Department — Code of Practice for Confined Spaces ↗

Start with the conditions on site.

Share the location, pipe dimensions, operating use and available inspection records to discuss the next step with our engineering team.